Author: James Wilkinson

  • 1011NH Station Activity

    1011NH Station Activities Order_Occ St_Line St_Station Arr_Date Arr_Time Dep_Date Dep_Time CTD BKT_T CALBOB MANTA PAIRV PRPOOS OOZEKI/TRAWL LTER SCCOOS TEMP SALT OXYG CHLO NUTS PHYT PRODO WEA SECCHI HPLC OPC DRIFT DIC/KEELING ANCILL REMRKS 1 93.3 26.7 101028 945 101028 1128 X01V01 X01V01 X01V01 X01V01 X01V01     X01V01   X01V01 X01V01 X01V01 X01V01 X01V01…

  • 1011NH Preliminary Plots

    1011NH Preliminary Plots

    1011NH Preliminary Plots (anomalies based on 50yr harmonics) Please note that these data are direct from the CTD and have not gone through thorough quality control checks. They are presented to give a general impression of current conditions. Final data plots will be published after all data are processed. Click the image for higher resolution…

  • 1011NH Station Plan

     CALCOFI 1011NH PREDICTED SCHEDULE Ver. Date 10-19-10 18:12                   Desired Lat               transit to next         Deep CTD  DIC   Lon sta Proc.# ETA hrs on sta ETD ATD St-Time Prodo PRPOOS   Oozeki     pH Comment 32 57.4…

  • 1011NH Cruise Summary

    Cruise Summary: CalCOFI 1011NH returned on RV New Horizon to San Diego 12 Nov 2010 at 1530 after occupying 67 out of 75 stations. Station operations were halted due to New Horizon’s generator failure; the last 5 stations on line 76.7 (76.7 70, 60, 55, 51, 49) were not occupied.  On the 76.7 80.0 prodo station,…

  • 1011NH Cruise Prospectus

    Cruise Dates: Thursday, 28 October 2010   Monday, 15 November 2010 Ship: SIO RV New Horizon Station plan: 75 Standard (66 CalCOFI + 9 SCCOOS) Cruise Map: Contacts: James Wilkinson (Chief Scientist), IOD   Dave Wolgast, IOD   Dave Griffith, NMFS     Participants:           Proposed station work: Seabird CTD / 24…

  • 1008NH Schedule

    1008NH Schedule

    CalCOFI 1008NH: 30 Jul – 17 Aug 2010; SIO R/V New Horizon departed San Diego 30 Jul at 0800 PST from MarFac and after successfully occupying 75 station returned to San Diego at 0600 17 Aug. Upon arrival to MarFac on 17 Aug and disembarking most of the scientific party, New Horizon sailed into San…

  • 1008NH Cruise Chronicle

    Dates & Times are UTC; Tweets were posted PST (-8) CalCOFI 1008NH returns to San Diego – great cruise! http://twitpic.com/2flcrz Tue Aug 17 13:00:53 +0000 2010 1008NH: Finished sta 77.49, the last CTD station. Heading to 77.53 for one last night Oozeki trawl. All 75 stations completed successfully. Mon Aug 16 06:55:25 +0000 2010 1008NH: Noon…

  • 1008NH Station Activity

    CalCOFI 1008 Station Activities Order_Occ Line Sta CALBOB MANTA PAIRV PRPOOS OOZEKI/TRAWL CTD SALT OXYG CHLO NUTS PHYT PRODO WEA SECCHI DRIFT DIC/KEELING REMRKS 1 93.3 26.7 X01V01 X01V01 X01V01     X01V01 X01V01 X01V01 X01V01 X01V01 X01V01 X01V01 X01V01 X01V01     CTD PROBS;DEPLOY TWICE 2 93.4 26.4 X01V01         X01V01…

  • 1008NH Preliminary Plots

    1008NH Preliminary Plots

    1008NH Preliminary Plots (anomalies based on 50yr harmonics) Please note that these data are direct from the CTD and have not gone through thorough quality control checks. They are presented to give a general impression of current conditions. Final data plots will be published after all data are processed. Click on image for higher resolution…

  • 1008NH Cruise Prospectus

    1008NH Cruise Prospectus

    Cruise Dates: Friday, 30 July 2010   Sunday, 17 August 2010 Ship: SIO RV New Horizon Station plan: 75 Standard (66 CalCOFI + 9 SCCOOS) Cruise Map: Contacts: Dave Wolgast, IOD (Chief Scientist)   Dave Griffith, NMFS   James Wilkinson, IOD